Skip to content
Al-Meftaha electrical panel production floor in Khamis Mushait

Manufacturing in Khamis Mushait, Saudi Arabia

Built Under
One Roof

From engineering review to final inspection, Al-Meftaha brings the critical stages of low-voltage panel manufacturing together through controlled in-house processes.

Since 2012Saudi manufacturing capability
In-houseEngineering through final testing
IEC & SBCStandards-led manufacturing
100%Boards tested before dispatch

Controlled production

Manufacturing depth you can see

Al-Meftaha manufactures project-specific electrical panels through coordinated engineering, enclosure fabrication, copper busbar processing, mechanical assembly, wiring, inspection, and testing.

Keeping these stages connected gives the team direct control over build quality, project ratings, component selection, panel arrangement, and final documentation.

The manufacturing journey

From approved design to delivery

Seven connected stages turn project requirements into a finished, inspected electrical assembly.

  1. Al-Meftaha factory production floor
    01

    Project definition

    Engineering

    Ratings, calculations, technical scope, applicable standards, single-line diagrams, schematics, and approved shop drawings define the build.

    • Technical review
    • Project-specific ratings
    • Approved production drawings
  2. Fabricated electrical panel enclosures on the factory floor
    02

    Enclosure production

    Sheet-Metal Fabrication

    Enclosures and internal partitions are cut, punched, formed, welded, treated, and powder coated to the approved arrangement.

    • Cutting and punching
    • Forming and welding
    • Polyester powder finish
  3. Copper busbars stored for electrical panel production
    03

    Copper preparation

    Busbar Processing

    Copper busbars are sized, cut, punched, bent, finished, and prepared to match the approved current and short-circuit requirements.

    • Cutting, punching, and bending
    • Project-specific sizing
    • Prepared for assembly
  4. Open low-voltage panel showing busbars and mounted components
    04

    Panel construction

    Mechanical Assembly

    Frames, compartments, busbars, gland plates, protective devices, controls, and accessories are installed to the approved layout.

    • Compartment assembly
    • Device mounting
    • Busbar installation
  5. Open electrical panel showing power and control wiring
    05

    Electrical integration

    Wiring & Integration

    Power and control wiring, ferruling, termination, labelling, metering, control devices, and protection functions are integrated to the wiring schedules.

    • Power and control wiring
    • Ferruling and labelling
    • Point-to-point verification
  6. Completed electrical panels prepared for inspection
    06

    Documented verification

    Testing & Inspection

    Completed panels undergo visual, mechanical, electrical, continuity, insulation, functional, protection, and interlock checks as applicable to the project.

    • Routine electrical tests
    • Functional verification
    • Factory acceptance support
    See Testing & FAT
  7. Organised component and material storage at Al-Meftaha
    07

    Final preparation

    Delivery

    After approval, the equipment is protected and prepared for dispatch together with the documentation required by the project scope.

    • Final quality release
    • Protection and packing
    • Project documentation

Equipment & capabilities

Production resources behind every build

The facility supports enclosure production, copper preparation, integration, and electrical verification within one coordinated manufacturing workflow.

Copper processing area inside the Al-Meftaha factory
Core capability

Busbar processing

Combined cutting, punching, and bending prepares copper bars for approved panel ratings and arrangements.

01

Sheet-metal line

Shearing, punching, and forming for enclosure panels and internal partitions.

02

Welding & drilling

Frame fabrication, bracketry, and mounting preparation for project-specific builds.

03

Powder coating

Electrostatic application and curing of polyester powder finishes.

04

High-voltage test set

Dielectric withstand testing of completed electrical assemblies.

05

Insulation & continuity testers

Electrical integrity and point-to-point verification against approved schedules.

Open panel prepared for detailed inspection and testing
Tested before dispatchInspection and verification are part of the manufacturing process—not an afterthought.

Quality & testing

Verified against the approved project requirements

Each completed assembly is checked against its approved drawings, construction requirements, wiring information, and project test plan before release.

Visual & mechanical inspectionWiring & continuity checksInsulation resistanceFunctional verificationProtection & interlock checksRecorded test documentation
Explore our complete Testing & FAT process

Plan your next panel build

Bring your project requirements to the factory.

Upload an SLD, BOQ, load schedule, or technical specification for review by the Al-Meftaha team.

Start a request for quotation